Loading


Categories (x) > Testers & Tools > Testers (x)

Results 11-20 of 65 < 1 2 3 4 5 > >> 

Product Data Sheets (pdf)...10/100/1000 Aggregator Taps

  • Manual... 
  • SOHO Plus Tester User Manual
    User Manual for the SOHOTEST and SOHOTEST-KIT (Version 1)
 

Product Data Sheets (pdf)...Fiber Blank for Module Rack

  • Manual... 
  • Cable Inspector Cable Tester User Manual
    User Manual for the CICT (Version 1)
 

Product Data Sheets (pdf)...LAN Pro LAN Pro Kit

  • Manual... 
  • Visual Fault Locator for Fiber Manual
    Manual for the FOVFL.
 

Black Box Explains...Cable termination.

STEP 1
Carefully remove the jacketing from the cable and expose one inch of the insulated wire conductors. Do not remove any insulation from the conductors. When the RJ-45 connector is... more/see it nowcrimped, the contacts inside will pierce the conductor insulation.

STEP 2
Untwist the wires to within 1/8" of the jacket. Arrange the wires according to the cable spec (568B in this case). Flatten and align the wires. Make one straight cut across all the conductors, removing approximately 1/2" to ensure the ends are of equal length.

STEP 3
Slide the wires into a connector. The cable jacket should extend into the connector about 1/4" for strain relief. Orient the wires so connector Pin 1 aligns with cable Pin 1, etc. Hold the connector in front of you. With the locking tab down, Pin 1 is on the far left.

STEP 4
Insert the connector into a crimp tool. Make sure you’re using the proper die. Firmly squeeze the handles. They’ll lock in a ratcheting action. A final click indicates the connector is firmly latched.

STEP 5
Check your work using a continuity tester or cable certifier rated for the cable standard you’re installing. Your tester should be able to check for shorts, opens, or miswires.

Wiring Standards collapse

  • Manual... 
  • Telephone Line Analyzer User Manual
    User Manual for the TLA1000 (Version 1)
 
  • Quick Start Guide... 
  • Basic Light Source Quick Start Guide (QSG)
    Quick Start Guide (QSG) for the FOLS-SM-100 and FOLS-MM-100.
 
  • Video...How to terminate and test copper cable.

    This hands-on Tips for Techs video takes you inside the Black Box Training Center to show you how to terminate and test cabling for a copper installation. The video begins... more/see it nowwith a step-by-step demonstration of terminating a patch cable up to the CAT6 specification, with special focus on how to cut and strip the cabling in a way that ensures good signaling integrity. Next, it covers how to validate and verify a backbone link between a patch panel and workstation. The video tutorial then demonstrates what kind of tester you’ll need if you must certify and document a copper link, then ends with a discussion on what you’ll need to simply verify the Ethernet performance of a cable run. collapse

Results 11-20 of 65 < 1 2 3 4 5 > >> 
Close

Support

Delivering superior technical support is our highest priority. Depending on the products or services we provide for you, please visit your appropriate support area.



 

You have added this item to your cart.

Important message about your cart:

You requested more of "" than the currently available. The quantity has been changed to them maximum quantity available. View your cart.

Print
Black Box 1-800-316-7107 Black Box Network Services